CAPACITY
90KW GRID-TIED
STATUS
OPERATIONAL
Industrial Case Study

GASCOR FACTORY

LOCATION
KEMPTON PARK

Scroll down

01
SECTION

THE LIABILITY

Gascor's Kempton Park facility faced a critical operational drain: massive energy bills for their administration building.

With energy-intensive HVAC systems, IT infrastructure, and office equipment running from 7 AM to 6 PM daily, monthly electricity bills were spiraling upward at 12% annually.

ANNUAL ENERGY COST
R 847k
GRID DEPENDENCY
98%
ANNUAL ESCALATION
12%
"Energy costs were consuming 31% of the facility's operational budget, making it impossible to scale manufacturing operations profitably."
— JOHAN PRETORIUS, FACILITIES MANAGER
02
SECTION

THE ENGINEERING

In4solar engineered a precision 90kW grid-tied rooftop array designed specifically to take the administration building off-grid during daylight hours.

90%
Cost Reduction
Massive reduction in operational energy expenses
280
Panel Array
High-efficiency monocrystalline modules
2.1yr
Payback Period
Rapid ROI with 99.6% system uptime
Smart Grid Integration
Bi-directional metering with real-time monitoring and automated failover protection
Admin Building Off-Grid
Effectively taking the administration building off-grid during peak daylight operations
Zero Export Configuration
Precision load matching to ensure zero waste and maximum self-consumption
System Capacity

90 KILOWATT

DEPLOYED

90,000
Watts Peak
280
Panels
380
kWh/Day

FINANCIAL IMPACT

ANNUAL SAVINGS
R 762k
First-year energy cost reduction vs original spend
DEMAND SAVINGS
R 116k
Annual reduction in peak demand variation penalties
CARBON OFFSET
132
Tons of CO₂ eliminated annually from operations
COST REDUCTION
90%
Total reduction in energy bills for the admin building
Solar Farm Background

Scale your operations with In4solar.

Request a technical feasibility study for your facility and discover how our engineering can transform your operational efficiency.